Framework was up in a few days, came all prefabricated so builders just more or less had to nail it together. This is the biggest part of the budget at $70k.
Rear view at the stage where they are waiting for the scaffolding to go up as it is rather high up on the roof at the back.
John surveying his territory from the kitchen/dining/family area. Looking out through the space for the sliding doors with verandah behind it.
Views from the verandah at the back, overlooking the hills, at the bottom of the orchard is the South West Highway.
Scaffolding starting to go up.
Scaffolding waiting to be assembled. Cladding on front bedroom. Garage is on the left.
Its spring down in the valley and typical of spring last Saturday was 32 deg and Sunday it poured rain all day and has continued off and on all week. Produce from the orchard, have picked a few big bunches of daffodils.
Have a great weekend
Jacky